

flow
Design/supervision flow
(For a typical detached house)

01.
Prior consultation
Please feel free to contact us with any questions.
After presenting your requests and budget, we will conduct a site survey and confirm the relevant laws and regulations before making a proposal based on simple drawings and models. Please confirm the direction based on the proposal and consider requesting design supervision from us.
(If a contract cannot be reached, please return drawings, models, etc.)
02.
basic design
We will sign a design supervision contract and proceed with formal design consideration. Based on your requests, we will hold meetings until you are satisfied with the plan and decide on a basic plan.
03.
final design
After deciding on the basic plan, we will create the necessary drawings for construction. We also check finishing materials, equipment, furniture, etc. at this stage. After the construction drawings are completed, we will prepare and submit the building certification application documents on behalf of the building owner. After consulting with the building owner, we will request a quote from a reliable construction company. (Usually 2 to 3 companies) We will evaluate the estimates and provide advice on selecting a construction company. After that, we will make detailed adjustments to the construction costs.

04.
Construction supervision
After construction begins, we will inspect and confirm that the work is being carried out according to the drawings. We will discuss with the construction company on site and confirm the details. After completion (sometimes it is done in the middle), we will witness an inspection by a confirmation inspection agency. We will conduct inspections and corrections for the building owner and supervisor.

05.
After-sales follow-up
One year after delivery, the builder and I will conduct a one-year inspection to confirm that there are no defects. We also provide after-sales follow-up consultations on a case-by-case basis.

faq